On site Substation
On-site 50MW substation
Dual-fed by two 115kV transmission lines
Back-up Ready
UPS back-up (N+1) for full critical loads
Back-up generators (N+1) for full critical loads
Resources
SH1 Data Center
Disaster Recovery Data Sheet